“The gear goes in really quick and there are always cases where you need to change things after already having installed them and the WBC gear is so easy to modify or re install. It saved us a lot of time.”
Project Manager – KLM Electical
Situation
38-storey office tower recognized as a grad A quality office space / re-tested to avoid unnecessary wait times / easy and quick lighting installation.
Task
Use WBC products to provide lighting to 23 levels of the tower / provide marked up drawings in advance / affordable and effective designed lighting / ease of modifying and reinstallation.
Action
6,880 total light fittings across 23 floors, that were scheduled for 11 deliveries over a 7month period / pre-test to ensure zero product failures.
Result
Making sure that all 11 deliveries across the 7 months were on time / marked up drawings designed in advance with the project manager to ensure most affordable and effective design was applied to the tower.