“Using the MyModular flexible cable for feeds from the local DB was around 50% faster than using stranded cable.”
Russel Sirsen Site Foreman- Downer EDI Engineering and Electrical Pty Ltd
Situation
A new 42-storey office tower spread across 65,000sqm, being the new headquarters for the Victoria Police. After a time, efficient and cost saving lighting solution for this project.
Task
Create a ‘turnkey’ solution where MyModular can provide this project with WBC 5PIN and MLEX 3PIN.
Action
MyModular’s WBC 5PIN and MLEX 3 PIN modular power leads and MLEX feeds that went back to the prewired distribution boards, as the fitting of accessories such as GPO’s.
Result
MyModular was able to provide a ‘turnkey’ solution that was both cost effective and time efficient. Providing MyModular lighting solutions to 31 office floors equating to more than 100,000 products used.