The Whyalla Secondary School project represents a cutting-edge development valued at $100 million, designed to accommodate 1500 students. It integrates three existing high schools from the region into one comprehensive facility.
Sturdie Electrical partnered with MyModular to utilize their 3Pin modular wiring solution, sourced locally from South Australia. This modular approach streamlines installation with a ‘plug and play’ system, effectively reducing lead times for the project.