“The quality, service and commitment shown by the MyModular team working with Ausco is a perfect example of the benefits of strategic partnering to deliver great project outcomes.’’
Andy Davey National Manager – Technical Development – Ausco
Situation
The new headquarters building for Ausco Modular’s National Office situated in Redbank, QLD. This
is a 500m² three storey corporate office comprising of 29 individual modules which are
prefabricated offsite in Ausco’s manufacturing facility and craned into final position on site.
Task
Provide a turnkey modular solution to allow as much electrical infrastructure to be installed in
factory prior to arriving on site. The intent is for the structured wiring solution to not only minimise
onsite labour, but also mitigate services coordination and errors which can arise during the build.
Action
Provided a full set of circuited electrical drawings (including cable tray reticulation) which was
separated into a module by module packaging solution to assist with efficiency of material
handling and wastage in the manufacturing facility.
Result
A pre-tested modular solution which allowed Ausco to connect all 29 modules together onsite
quickly and confidently while mitigating the risk of commissioning faults.