“These MyModular ELV temp lighting are so quick & easy to deploy onsite saving us time & materials whilst also providing the latest in compliance & safety.”
Alastair Koenig | Director | Eltrix
Situation
Alastair Koenig from Eltrix contacted MyModular because an electrocution occur onsite, and he was interested in the safety our products provide.
Task
To provide an ELV temp. lighting solution, that needed to replace the 240V temporary lighting system that was already installed.
Action
Used MyModular’s ELV Temporary Lighting solutions to ensure there wasn’t a risk of electric shock. Provide a safe construction site that still has adequate lighting even in a power outage situation.
Result
MyModular were able to provide Eltrix with a suitable ELV solution that was both safe and practical.