The Victorian Heart Hospital is Australia’s first state-of-the-art, specialist cardiac hospital. It will provide innovative, holistic and patient-centred care, as well as world-leading research and education.
To help make this installation as simple and straight forward as possible, the products were all supplied using the MyModular Pack By Circuit details which meant the team on-site could distribute and install the cables with confidence.
The project scope included every room which required DALI light fittings. The WireByClick 5PIN modular lighting loom solution was supplied for all general lighting though out. As part of the process MyModular completed detailed marked up drawings complete with a bill of materials for each floor zone illustrating the intended installation plan making install onsite simple and efficient. Because product was made locally it reduced lead times from 12 weeks to 4 weeks for all lead orders.