1300 546 449 Mon - Fri 09:00 - 17:00 Plant 5, 6 Sherriffs Road, Lonsdale SA 5160

1 Denison Street Temp. Lighting

Project Description

 

“MyModular’s ELV temporary lighting system has enabled our team to ensure sufficient lighting as been provided throughout the construction of the 1 Denison Street project”

Brendan Parameter Site Manager- Star Group

 

Situation

37-level commercial office tower is the largest and tallest building within North Sydney CBD, with over 60,000sqm of premium office space. Client wanted a ‘plug and play’ temporary lighting solution that is reusable and low voltage for a safer installation on site.

Task

MyModular determined that ELV-Lite would be best suited for this project because of the safety features the lights have. ELV-Lite also proved to be best suited for this project as all the light fittings are extra low voltage which eliminates an unsafe installation environment for temporary light fittings.

Action

Providing the electrical contractor with an entirely modular lighting system, which they will be able to reuse on other projects and builds. Flexibility and faster installation resulting in lower costs for labour.

Result

MyModular provided the office tower with over 3,000 ELV-Lite temporary light fittings through the office tower. The newest ELV flood lights were added to the project to help illuminate bigger spaces, while reducing the number of lights required in those larger spaces, these can be recycled for use of future projects.

ClientStar Group
Project ScopeTemporary Lighting
LocationNorth Sydney CBD, NSW
Products used3,000+ ELV Lite Products
Tags, ,